Customer Challenges

  • Steep increase in build rate
  • Anticipated increase in non-conformances
  • Local suppliers and in-house resources unable to drive offshore, realizing modest cost reduction

Benefits

  • Increased production throughput Enabled 3X build rate
  • Reduced cost of Non-Quality – $10M annual savings
  • Process improvement – Faster, Better, Cheaper Time for disposition – 1/5th
  • Capability – 32 delegated design signatories