Customer Challenge
Create Assembly Process Plan
A major rail manufacturer in Europe produces bogies for various product family. On-time shipment of bogies determines delivery of trains to their end customers.
Challenge is to reduce current TAKT time of XX days to 3 days due to steep increase in demand of trains build rate. Timely resolution of non-conformances is also critical to ensure product integrity and reputation.
Hence, they are looking for a support partner to come up with engineering solutions to eliminate all the issues.
Scope
- To reduce TAKT time by defining complete assembly strategy, tooling design, build plan, visual aid creation & sustaining production hours by position
Solution
- Create assembly process plan & condition of supply
- Optimize the assembly strategy
- Identify number of assembly tooling requirement
- Design of assembly tooling and BOM
- Storage solution for assembly tooling
- Creation of build book
- Creation of 3D visualization of assembly process
- Optimized floor plan layout
- Precedence chart
- Line of balance
Features
Features
- Quest with its expert capabilities, reviewed the reference assembly design data and developed new feasible concepts with stress analysis. Also verified design solutions by ergonomics simulation
- Deliverables: detailed & assembly designs & manufacturing drawings, floor plan, build plan, precedence chart, 3D technical instructions
- Co-ordinated and obtained all mandatory specialist approvals
Benifits
- TAKT time to be proved virtually to 3 days
- Reduced assembly time (data not shared by customer)
- ‘Fool proof’ wherever necessary (Poka Yoke)
- Improved quality & reduced production time
- Standardized operating procedure for family variants
- Mobile assemblies – Can transport to different locations for assembly & test