Customer Challenges
- Steep increase in build rate
- Anticipated increase in non-conformances
- Local suppliers and in-house resources unable to drive offshore, realizing modest cost reduction

Benefits
- Increased production throughput Enabled 3X build rate
- Reduced cost of Non-Quality – $10M annual savings
- Process improvement – Faster, Better, Cheaper Time for disposition – 1/5th
- Capability – 32 delegated design signatories