Challenge

A Japan-based heavy industries giant, holding approximately 70% of the global market share in the Carbon Capture business, faced significant challenges amid accelerating global decarbonization initiatives. While these initiatives created substantial business momentum, the company needed to strengthen and expand its team globally to enhance end-customer engagement in project engineering, particularly in priority markets across the UK, USA, and Canada.

The client’s immediate needs were twofold: they required rapid studies and concept designs to support carbon capture proposal submissions, while simultaneously producing detailed front-end engineering documents for an awarded project. This had to be accomplished without depleting the bandwidth of their in-house technology specialists, creating a critical resource management challenge.

Solution

We leveraged our local-global (glocal) engagement model under a Centre of Excellence (CoE) framework for optimal results.

Thumbnail Image

The CoE framework created an efficient model to execute all engineering tasks required before successfully bidding for global carbon capture projects

Quest Global engineers conducted a thorough feasibility study, including process simulations and safety analyses

Our experts estimated equipment requirements, plot area, and utilities needs

We carefully evaluated potential construction and installation challenges

The team developed a thorough basis of design, including 3D modeling and preliminary plot plans for the Pre-FEED and FEED phases

Our engineers created essential engineering drawings and actively supported planning activities

Quest Global team addressed various aspects, including O&M, HSE, piping, electrical, mechanical, civil, structural, and C&I

We also provided on-site support for the physical construction of the Carbon Capture plant

The team also developed and delivered granular pre-commissioning and commissioning plans

Results – at a glance

The Quest Global team enhanced the client’s global capabilities to improve customer engagement

Carbon Capture

We have strengthened their market position in priority regions (U.K., U.S.A, and Canada)

Carbon Capture Two

Our engagement has accelerated project timelines, supporting business growth in the carbon capture market

Co2

Our teams accurately estimated the required plot area for the carbon capture facility

Carbon Capture Four

The client has also achieved a 95% CO2 capture target through detailed equipment requirements

Nine Five Co2

We also provided a thorough utility requirements assessment for better resource planning

Carbon Capture Six

Our thorough requirements assessment facilitated informed decision-making through tentative project cost estimation

Carbon Capture Seven

Our engineers also identified and addressed potential construction and installation challenges proactively

Installation Challenges

The project has resulted in the construction of a plant capable of capturing 95% of CO2 from power plant exhaust gas, processing 1,013,740 Nm³/h of flue gas at 175°C with 8 mol% CO2 concentration

Carbon Capture Nine